{"id":9309,"date":"2025-07-17T18:28:03","date_gmt":"2025-07-17T18:28:03","guid":{"rendered":"https:\/\/bridgescourtocs469.com\/?page_id=9309"},"modified":"2025-07-17T18:29:30","modified_gmt":"2025-07-17T18:29:30","slug":"about-us","status":"publish","type":"page","link":"https:\/\/bridgescourtocs469.com\/?page_id=9309","title":{"rendered":"About Us"},"content":{"rendered":"<section class=\"l-section wpb_row height_custom\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default\"><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><h2>About Us &amp; What We Offer<\/h2>\n<\/div><\/div><div class=\"w-separator size_custom\" style=\"height:30px\"><\/div><div class=\"wpb_text_column us_custom_1862c45e has_text_color\"><div class=\"wpb_wrapper\"><p>Bridge Scour Management to CS469 Limited is a small civil and maritime consultancy with over 40 years of international experience.<\/p>\n<\/div><\/div><div class=\"w-separator size_custom\" style=\"height:30px\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>Please NOTE: My e-mail address; info@bridgescourtocs469.com has crashed due to the C-Panel server company going out of business. Use praeparatus52@gmail.com<\/p>\n<p>Note: This web site has now been updated to reflect the new (Jan 2025) rebranded company; \u201cBridge Scour Management to CS469 Limited from the earlier, \u201cPraeparatus Limited\u201d Company.<\/p>\n<p>The company usually specialises in Project Management and Design Co-ordination. However, in response to the increasing threat from Climate Change and extreme weather events, the new company has developed a highway bridge scour risk assessment package. The scour risk assessment process we provide fully complies with the requirements of the UK D.M.R.B. Standards for Highways, Inspection and Assessment, version 1.0.0 CS469 \u2013 \u201cManagement of scour and other hydraulic actions at highway structures\u201d. This document came into effect in April 2024 and supersedes BD97\/12 \u2013 \u201cThe Assessment of Scour and other hydraulic actions at Highway Bridges.\u201d<\/p>\n<p>All Highway Authorities have a programme of bridge maintenance and Inspections. For Special Inspections on road over river bridges, underwater examinations are necessary to determine the condition of the river bed at the bridge foundations. This is all well and good, but it does not assess how resilient the bridge structure is to the effects extreme flooding events. Recent flooding events from the major storm Desmond in Cumbria in 2015 and from around the world, show the catastrophic effects of flood water. The resulting storm waters can create bridge scour, foundation undermining and ultimately bridge collapse. This causes a threat to life and property and cuts off communities by destroying our vital infrastructure.<\/p>\n<\/div><\/div><div class=\"w-separator size_custom\" style=\"height:30px\"><\/div><div class=\"w-image align_none\"><div class=\"w-image-h\"><img decoding=\"async\" width=\"1000\" height=\"650\" src=\"https:\/\/bridgescourtocs469.com\/wp-content\/uploads\/2025\/07\/scour-jun-13.jpg\" class=\"attachment-full size-full\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/bridgescourtocs469.com\/wp-content\/uploads\/2025\/07\/scour-jun-13.jpg 1000w, https:\/\/bridgescourtocs469.com\/wp-content\/uploads\/2025\/07\/scour-jun-13-300x195.jpg 300w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/div><\/div><div class=\"w-separator size_custom\" style=\"height:30px\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p>To carry out the CS469 scour risk assessments, Bridge Scour Management to CS469 will issue an individual site inspection proforma for the bridge inspectors to use to gather the site data. In the majority of cases, a topographical survey &amp; an underwater examination is required. The bridge data is then entered into a Level 1 scour risk assessment workbook to determine the Level 1 Scour Risk Rating. If this initial assessment scour risk rating is a score of 10 or less then it is deemed to be a Low Risk structure, and there is no need to progress further. If however, the scour risk rating is over 10 then then it is recommended to undertake a Level 2 assessment, using the Level 2 SRA workbook. The Level 2 SRA work involves the use of the FEH web site to establish the catchment and then uses the WINFAP software to determine the 0.5%AEP or a 1:200 year return period storm flow at the bridge. The hydraulic characteristics of the river and the geometry of the bridge are used to determine the flow velocity and hence the theoretical depth of scour. If the Level 2 SRA gives either a 40 or 60 risk rating then the structure is deemed at medium risk. With a scour risk rating of 80 or 100 then the bridge is deemed to be a high risk structure. Advice is then given on how to improve the resilience of the bridge and how to protect it from extreme weather flooding events.<\/p>\n<\/div><\/div><div class=\"w-separator size_custom\" style=\"height:30px\"><\/div><div class=\"wpb_text_column us_custom_f3d15136 has_text_color\"><div class=\"wpb_wrapper\"><p>Don\u2019t let this happen to one of your bridges!<\/p>\n<\/div><\/div><div class=\"w-image align_none\"><div class=\"w-image-h\"><img decoding=\"async\" width=\"1000\" height=\"650\" src=\"https:\/\/bridgescourtocs469.com\/wp-content\/uploads\/2025\/07\/scour-jun-14.jpg\" class=\"attachment-full size-full\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/bridgescourtocs469.com\/wp-content\/uploads\/2025\/07\/scour-jun-14.jpg 1000w, https:\/\/bridgescourtocs469.com\/wp-content\/uploads\/2025\/07\/scour-jun-14-300x195.jpg 300w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/div><\/div><div class=\"w-separator size_custom\" style=\"height:30px\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p><strong>Completed Assessments To Date<\/strong><\/p>\n<p>This Consultancy has previously completed 155no. Level 1 and 92no. Level 2 BD97\/12 bridge scour assessments for Warwickshire C.C. and 11no. Level 1 and 2 scour assessments for Solihull Met. B.C.<\/p>\n<p>In early 2024 we have completed fifteen BD97\/12 level 1 &amp; level 2 SRA\u2019s for Inertia Consulting. In light of the Standards for Highways new document, all structures will now be assessed in accordance with the CS469 code.<\/p>\n<p><strong>What We Offer<\/strong><\/p>\n<p>The bridge scour assessments to CS469 can be arranged for example, by using a Supplier Consultancy contract directly with the Highway Authority. These bridge scour assessments are a very cost-effective method for prioritising the needs of the Local Authority and for planning works to protect the infrastructure.<\/p>\n<p>Bridge Scour Management to CS469 can also offers Project Management and Design Co-ordination services. We can arrange all types of bridge examinations, Special Inspections as underwater examinations with STE07 qualified diving teams and small craft boat surveying.<\/p>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/section>\n","protected":false},"excerpt":{"rendered":"About Us &amp; What We Offer Bridge Scour Management to CS469 Limited is a small civil and maritime consultancy with over 40 years of international experience. Please NOTE: My e-mail address; info@bridgescourtocs469.com has crashed due to the C-Panel server company going out of business. Use praeparatus52@gmail.com Note: This web site has now been updated to...","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-9309","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/bridgescourtocs469.com\/index.php?rest_route=\/wp\/v2\/pages\/9309","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bridgescourtocs469.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/bridgescourtocs469.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/bridgescourtocs469.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bridgescourtocs469.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9309"}],"version-history":[{"count":4,"href":"https:\/\/bridgescourtocs469.com\/index.php?rest_route=\/wp\/v2\/pages\/9309\/revisions"}],"predecessor-version":[{"id":9315,"href":"https:\/\/bridgescourtocs469.com\/index.php?rest_route=\/wp\/v2\/pages\/9309\/revisions\/9315"}],"wp:attachment":[{"href":"https:\/\/bridgescourtocs469.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9309"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}